Help Protect Swillington Farm from HS2 destruction

Swillington Organic Farm and Swillington Park Fishing are threatened by the proposed High Speed Rail route.

Watch the video and read below to find out more and how you can help to save this valuable wildlife habitat and resource for people of Yorkshire.


 1. Respond to the route consultation by 31 January 2014.

This is the most important thing you can do.

Download our local template response: HS2 Response to route consultation (right click to download) or write your own letter.

This has been written in collaboration with local residents and our MP, it proposes an alternative route that will follow the existing railway and motorway and has been backed by Leeds City Council as a preferable route.

Send it to:

Email: HS2PhaseTwoRoute@Ipsos.com

Freepost RTEL-YAZX-HAZT
Phase Two Route Consultation
PO Box 1152
HARROW
HA1 9LH

2. Write to your MP and tell them you disagree HS2′s preferred route.

This can be done online at https://www.writetothem.com/

3. Share this with friends, family and colleagues:




2 thoughts on “Help Protect Swillington Farm from HS2 destruction

  1. Pingback: 'We want HS2 college in Leeds' - council chiefs - The Leeds Guardian

  2. Pingback: HS2 & Swillington Farm | Sean Murricane

Comments are closed.